---
name: dmaic-project-manager-cc573cbc5a72
description: DMAIC methodology execution skill with tollgate reviews, documentation templates, and project tracking
allowed-tools:
  - Read
  - Write
  - Glob
  - Grep
  - Edit
metadata:
  specialization: operations
  domain: business
  category: six-sigma-spc
graph:
  domains: [domain:operations]
  skillAreas: [skill-area:change-management, skill-area:statistical-analysis, skill-area:business-analysis]
  workflows: [workflow:vendor-onboarding, workflow:vendor-evaluation]
  roles: [role:operations-analyst, role:business-analyst, role:project-manager]
---

# DMAIC Project Manager

## Overview

The DMAIC Project Manager skill provides comprehensive capabilities for executing Six Sigma DMAIC (Define, Measure, Analyze, Improve, Control) projects. It supports tollgate reviews, documentation management, and benefit quantification throughout the improvement lifecycle.

## Capabilities

- Project charter development
- SIPOC diagram generation
- CTQ (Critical to Quality) tree construction
- Tollgate review facilitation
- Phase documentation management
- Deliverable tracking
- Benefit quantification

## Used By Processes

- SIX-001: DMAIC Project Execution
- CI-001: Operational Excellence Program Design
- SIX-005: Root Cause Analysis

## Tools and Libraries

- Project management platforms
- Six Sigma templates
- Tracking tools
- Statistical software integration

## Usage

```yaml
skill: dmaic-project-manager
inputs:
  project_name: "Reduce Defect Rate in Welding Process"
  business_case:
    current_defect_rate: 5.2
    target_defect_rate: 1.0
    estimated_savings: 250000
  phase: "measure"  # define | measure | analyze | improve | control
  team:
    champion: "VP Operations"
    black_belt: "Jane Smith"
    green_belts: ["John Doe", "Mary Johnson"]
outputs:
  - project_charter
  - sipoc_diagram
  - ctq_tree
  - phase_deliverables
  - tollgate_checklist
  - benefit_calculation
```

## Workflow

### Define Phase
1. Create project charter
2. Develop SIPOC diagram
3. Build CTQ tree
4. Define problem statement
5. Conduct tollgate review

### Measure Phase
1. Identify key metrics
2. Develop data collection plan
3. Validate measurement system
4. Establish baseline performance
5. Conduct tollgate review

### Analyze Phase
1. Identify potential root causes
2. Verify root causes with data
3. Determine critical Xs
4. Quantify opportunity
5. Conduct tollgate review

### Improve Phase
1. Generate solution alternatives
2. Select optimal solutions
3. Pilot improvements
4. Implement full-scale
5. Conduct tollgate review

### Control Phase
1. Develop control plan
2. Implement statistical controls
3. Document standard work
4. Transfer to process owner
5. Conduct tollgate review

## Integration Points

- Project management systems
- Statistical analysis software
- Document management systems
- Financial tracking systems


---
Source attribution: a5c-ai
Original project: https://github.com/a5c-ai/babysitter
License: MIT
License information: https://opensource.org/license/mit
Original upstream instructions; downloaded from Mega AI Hub.

## Upstream license notice

MIT License

Copyright (c) 2026 Gabriel Moreira

Permission is hereby granted, free of charge, to any person obtaining a copy
of this software and associated documentation files (the "Software"), to deal
in the Software without restriction, including without limitation the rights
to use, copy, modify, merge, publish, distribute, sublicense, and/or sell
copies of the Software, and to permit persons to whom the Software is
furnished to do so, subject to the following conditions:

The above copyright notice and this permission notice shall be included in all
copies or substantial portions of the Software.

THE SOFTWARE IS PROVIDED "AS IS", WITHOUT WARRANTY OF ANY KIND, EXPRESS OR
IMPLIED, INCLUDING BUT NOT LIMITED TO THE WARRANTIES OF MERCHANTABILITY,
FITNESS FOR A PARTICULAR PURPOSE AND NONINFRINGEMENT. IN NO EVENT SHALL THE
AUTHORS OR COPYRIGHT HOLDERS BE LIABLE FOR ANY CLAIM, DAMAGES OR OTHER
LIABILITY, WHETHER IN AN ACTION OF CONTRACT, TORT OR OTHERWISE, ARISING FROM,
OUT OF OR IN CONNECTION WITH THE SOFTWARE OR THE USE OR OTHER DEALINGS IN THE
SOFTWARE.



# Mega AI Hub resource metadata

Creator / publisher: a5c-ai
Original project: https://github.com/a5c-ai/babysitter
Attribution basis: Upstream repository explicitly recorded in package mirror path

Fields of work: Operations, Product Management, Project & Program Management
Roles: Business Process Analyst, Growth Product Manager, Operations Manager, Product Manager, Project Manager
Specialties: Specialty not specified
Tools: Project Management Platforms, Statistical Software
Country applicability: Country not specified
Classification basis: Source catalog labels
Instruction SHA-256: fb4e4b6ff04ac204ad6a44436d152e50bcba27552b6b6dd3c96675e65ca51fd9
